Best quality projects & assignments at
less price. Mail your requirement at
Call us at 9815333456.
________________________________________________________
|
TABLE
OF CONTENTS
|
|
|
|
EXECUTIVE SUMMARY
5
|
|
OBJECTIVE OF THE PROJECT
6
|
|
INTRODUCTION OF COMPANY 7
|
|
INTRODUCTION
OF BSPS
12
|
|
VISION
& MISSION
14
|
|
REVIEW
OF LITERATURES
15
|
|
PERFORMANCE MANAGEMENT SYSTEM IN NHPC 17
|
|
MAP PERFORMANCE CYCLE
21
|
|
Part B- SKILL/ COMPETENCY ASSESSMENT
32
|
|
RESEARCH METHODOLOGY
40
|
|
DATA ANALYSIS 41
|
|
RESEARCH FINDINGS
50
|
|
CONCLUSION
50
|
|
SUGGESTIONS
51
|
|
LIMITATIONS
51
|
|
QUESTIONNAIRE
52
|
|
REFRENCE & BIBLIOGRAPHY
54
|
EXECUTIVE SUMMARY
The Performance Management System is a process
of setting objectives, making plans to achieve those objectives and
accomplishing the desired results. Rewards and recognition are the end stage of
this process. Organizations use this system to assess the performance of an
individual, a team, a function and then the organization as a total. In this
project, the whole performance management system is described
for the company NHPC.
This
cycle starts when NHPC signs a Memorandum of Understanding (MoU) with the Government of
India. In this memorandum the vision, mission and values, targets and action
plans are mentioned. In NHPC, system have been devised to cascade
Organizational Goals into individual goals by framing out objectives of the
company from the MoU at corporate level and there by preparing a Balance Score
Card both at corporate and unit level. The summarized feature of this process
is sequentially breaking down the organizational goals into an individual’s
e-MAP.
This project describes about the Performance
Management System which is followed in NHPC. This project also describes the problems
faced by the appraisees and the appraisers in this system. It also elaborates
about the steps taken by the appraisers to improve the performances of the appraisees
so that their efficiency can be increased and later the rewards and
recognitions are given in the form of promotions, incentives and empowerment.
1. INTRODUCTION
OF COMPANY
|
NHPC LIMITED
NHPC Limited (Formerly National Hydroelectric Power Corporation), A
Govt. of India Enterprise, was incorporated in the year 1975 with an
authorised capital of Rs. 2000 million and with an objective to plan, promote
and organize an integrated and efficient development of hydroelectric power
in all aspects. Later on NHPC expanded its objects to include other sources
of energy like Geothermal, Tidal, Wind etc
Market Value
At present, NHPC is a schedule 'A' Enterprise of the
Govt. of India with an authorized share capital of Rs. 1,50,000 Million .
With an investment base of over Rs. 2,20,000 million Approx. In 2009-2010
NHPC made a profit after tax of Rs2090 crores . A increase of 94% than the
previous year profit of 1050 crores. NHPC is among the top ten companies in
India in terms of investment. Department of Public Enterprise, Govt. of India
recently conferred prestigious Miniratna status to NHPC.
Initially, on incorporation, NHPC took over the
execution of Salal Stage-I, Bairasiul and Loktak Hydro-electric Projects from
Central Hydroelectric Projects Control Board. Since then, it has executed 14
projects with an installed capacity of 5295 MW on ownership basis including
projects taken up in joint venture. NHPC has also executed 5 projects with an
installed capacity of 89.35 MW on turnkey basis. Two of these projects have
been commissioned in neighbouring countries i.e. Nepal and Bhutan at a
capacity of 14.1 &60 MW.
On-going work
Presently NHPC is engaged in the construction of 10
projects aggregating to a total installed capacity of 4502 MW . NHPC has
planned to add 5322 MW during 11th Plan period. 12 projects of 9651 MW are
awaiting clearances/Govt. approval for their implementation. Detailed
Projects report or Feasibility Report are being prepared for 7 projects of
5755 MW.
Since its inception in 1975, NHPC has grown to become
one of the largest organizations in the field of hydro power development in
the country. With its present capabilities, NHPC can undertake all activities
from concept to commissioning of hydroelectric projects.
Hydro Power Stations
Total - 5295 MW
Hydro Power Stations Under construction
Total - 4502 MW
Hydro Power Stations constructed on Deposit/Turnkey Basis
Total - 89.3 MW
During
the financial year 2010-2011 ,
NHPC Power Stations achieved the highest ever generation of 18604 MU.
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
GENERATION
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Best quality projects & assignments at less
price. Mail your requirement at
Call us at
9815333456.
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
![]() |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
During
the period 2010-2011 , NHPC had a
sales turnover of 4046.59 crore with
a Net Profit of 2166.67 crore.
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
SALES Vs PROFIT
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
![]() |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Presently
NHPC is engaged in the construction of 10 projects
aggregating to a total installed capacity of 4502 MW.
NHPC has added 1970 MW
during the 10th Plan period and planned to add 2230 MW during 11th Plan period. 12 projects of 9651 MW are awaiting clearances/Govt.
approval for their implementation. Detailed Projects report are being
prepared for 7 projects
of 2485 MW.
Since
its inception in 1975, NHPC has grown to become one of the largest
organisation in the field of hydro power development in the country. With its
present capabilities, NHPC can undertake all activities from concept to
commissioning of Hydroelectric Projects.
|
OBJECTIVE OF THE PROJECT
To study the process and to understand the
importance of Performance Management System in NHPC that synchronizes the performance of the
employees so as to make the work effective.
- To analyze the Performance Management
System of NHPC
in detail and its effectiveness.
- To analyze the problems faced by the appraisee and the appraiser
in this system.
- To analyze the steps taken by the appraisers for the improvement
of the performances of the appraisees.


No comments:
Post a Comment